Craft · Seven processesYITONG

From a single wire to a finished harness.

Scroll to assemble a YITONG harness process by process — from design to 100% inspection. Click any step to jump, drag to look around.

01/ 07Design

Design & Prototyping

3D routing, BOM and first-article samples validated against your drawings.

  • Input · drawing / BOM / sample
  • Output · 3D routing + first article

02/ 07Cut & strip

Cutting & Stripping

Cut length and strip dimensions checked against engineering drawings and work instructions.

  • Cutting machine · strippers
  • Steel ruler · caliper
  • 4 pcs / 2 h · dimension record

03/ 07Crimp

Terminal Crimping

Terminal specification, crimp appearance and retention force checked; sampling: 4 pieces every 2 hours.

  • Terminal machine
  • Pull-force tester · micrometer
  • Magnifier check in-process

04/ 07Braid

Braid Shielding

Tinned-copper tight braid, ≥ 92% coverage, effective EMI suppression.

  • Tinned copper
  • Coverage ≥ 92%
  • EMI suppression

05/ 07Molding

Molding & Overmolding

Custom injection and overmolding for strain relief and sealing.

  • Strain relief · sealing
  • Wire order & terminal seating
  • 4 pcs / 2 h

06/ 07Routing

Assembly & Routing

Cable ties, sleeves and labelling per the loom drawing — neat and traceable.

  • Ties · sleeves · labels
  • Heat-shrunk tight, never scorched
  • Traceable

07/ 07Inspect

100% Inspection

Continuity testing and visual inspection, with final inspection records before shipment.

  • Continuity tester CCL-W-1256
  • 100% visual
  • Final inspection record

✓Assembled

Assembled. Inspected. Ready to ship.

Every harness follows the same documented process. See the ten-stage QC plan behind it.

QC1T-W-PG-010 · REV. B0

Ten controlled stages, on record.

Behind the seven processes sits our QC control plan — from incoming inspection to finished-goods storage, each stage with its frequency, method and record.

Factory photo

01MATERIAL / IQC

Incoming inspection

Check purchased materials against engineering data, inspection specs and the supplier outgoing report.

Frequency
1 time / batch
Method
Visual, measurement and related tests
Record
Incoming inspection record
Factory photo

02MATERIAL / CONTROL

Material storage & issue

Storage: stock card, location label and protection. Issue: match name, part number and quantity to the work order.

Frequency
Storage: random; issue: 1 (as on plan)
Method
Visual inspection and measurement
Record
Stock-in / material issue forms
Factory photo

03PROCESS / DIMENSIONS

Cutting & stripping

Verify wire spec, cut length and strip dimensions; check conductors for damage or broken strands.

Frequency
4 pieces / 2 hours¹
Method
Steel ruler and caliper
Record
Dimension record
Factory photo

04PROCESS / CRIMP

Terminal crimping

Check terminal spec, crimp appearance and retention force to the drawing and work instructions.

Frequency
4 pieces / 2 hours
Method
Pull-force tester and micrometer
Record
Terminal measurement / patrol records
Factory photo

05PROCESS / CHECK

In-process inspection

Inspect terminal specification and crimp appearance with a magnifier.

Frequency
1 (as on plan)
Method
Visual / magnifier
Record
Patrol inspection record
Factory photo

06ASSEMBLY / POSITION

Housing assembly

Insert terminals into the housing; confirm wire order, wire positions and terminal seating.

Frequency
4 pieces / 2 hours
Method
Visual inspection
Record
Engineering drawing / work instructions
Factory photo

07ASSEMBLY / PROTECTION

Sleeving & heat shrinking

Fit the specified sleeve and shrink it in place without heat damage.

Frequency
4 pieces / 2 hours
Method
Hot-air gun / oven; visual
Record
Engineering drawing / work instructions
Factory photo

08FINAL / INSPECTION

Electrical & visual inspection

Run continuity test to the required parameters, then visual inspection.

Frequency
1 (as on plan)
Method
CCL-W-1256 tester; visual
Record
Final inspection record
Factory photo

09DELIVERY / RELEASE

Packing & outgoing sampling

Confirm packing method, then sample finished goods to specs, drawings and customer requirements.

Frequency
Packing: 1 / 2 hours; sampling: 1 / batch
Method
Visual, measurement and testing
Record
Patrol record / outgoing inspection report
Factory photo

10DELIVERY / STORAGE

Finished-goods storage

Store accepted finished goods with matching stock records, correct location labels and protection.

Frequency
After sampling acceptance
Method
Visual inspection
Record
Stock-in form
01 / 10 Drag or swipe the cards

¹ Cutting, sheath stripping and wire stripping: 4 pieces / 2 hours. Photos show our factory, not necessarily the specific operation. Consult the original plan for individual requirements.

YITONGBuild to print

Send a drawing. We’ll build it right.

Drawing, BOM or sample — an engineer replies within 24 hours with process and quality questions answered.